Group 3 - Music Video

Group 3 - Digipak

Group 3 - Digipak
Our Digipack, top left - back, top right - front, bottom left - inside panel, bottom right - inside panel (CD)
This is a link to our website, click the image above to enter our site

Wednesday 18 March 2015

Construction Post 6: Reflections on edit week 2

Me at the edit suite.

Above is our edit schedule for week 2. The reason why Mario's name is not on there is because he was on an AS Geography coursework trip so he made up for it by editing really hard in week 1 and on the Monday of week 2.

During the rest of week 2 me and Thakshana edited according to our schedule. We used various tools but mainly the the razor tool, the pen tool, ProCamp and the Three-way colour corrector.

What needed to be done and was completed
  • We added in all the new shots from the back up shoot
  • We rewrote the voiceover with Chris's (our media technician's) help and Mario rerecorded it on Monday after which me and Thakshana edited it in.
  • We had to grade a few shots using the Three Way Colour Corrector
  • We added transitions to the titles to make the opening more visually exciting
  • We also perfected the sound, music and voiceover volume levels
Here is the final result.

No comments:

Post a Comment